Main phases of repair in the apartment

Main phases of repair works in the apartment.

How to begin repair of the apartment?

The first phase of the repair of old houses is the damage and taking apart firstly of the shabby walls and partition walls, getting rid of the wall and ceiling finishing. This phase is among the most "dirty" stages of the repair.

One more amongst the most crucial and "dirty" works is the window block replacement. It is essential to do this to start with due to the fact that dirt and dust will be unallowable during following phases and it is restricted at all to open windows during painting and wallpaper works (big drops of the temperature and wetness are unallowable). After installing windows and windowsills it is essential to load them immediately in polyethylene film and to cover Click here for more windowsills in addition by the fiber board (in order to prevent scratches).

The following stage is wiring. Circuitry can be set up in walls or along the floor. Electrical wiring is made inside the pipes to make sure electrical safety and increase reliability. The pipe secures electrical wiring from external damages and permits to change the wire entirely without breaking walls and floor simply by inserting the new wire instead of the old one.

House Painting follows the electrical wiring. The regular error during the simultaneous conducting of such works takes place when workers forget to set out one of the cable televisions and home painters have currently plastered and smoothed out the wall. As a result, extra works are essential to seal chases on the ended up wall. The places of the feed switch and wall outlet location and their number must be thought-out ahead of time. The plan of power circuitry is usually consisted of into the style project.

Later on the system must be ready to service in case of failures. In addition to the wirings, the telephone cable television and the TV cable television are laid out. The power cable television must not be laid out near the telephone and antenna cable televisions to prevent noise pickup and disturbance. The most peculiar moment is setting out the TV cable. In order to make two (or 3) TV sets in the home the 2nd cable television is frequently just "securely soldered" in parallel, so the cable television resistance is reduced. As a result, the screen quality is weakened, many programs can't be gotten and etc. In order to prevent such situation it is needed to welcome a professional with unique equipment. He will determine the signal level of the each TV-feeder and install TV-amplifiers or TV-filters.

Painting is the most long-term procedure, that is why it is performed all at once in all properties, if it is possible. Delays are linked with the innovation. Each applied layer of the plaster (or completing ending up) should dry completely before the work will continue.

Works in hygienic plans and the cooking area start concurrently with home painting. It is much better to fulfill so-called "unclean" operate in the top place and at the same time. In accordance with the strategy of the sanitary service technician place welding, wall chasing and pipe run are carried out. Steam radiator admissions are prepared, taps and brackets are mounted, however radiators are not installed.

Then works in hygienic plans are performed according to the plan. The bath is installed, then walls are smoothed out and the tile is laid on walls. The list below stage is putting together ceiling and laying tiles on the flooring. And at last other sanitary devices, mixers and accessories are mounted.

After circuitry, setup of rosette plates and terminal boxes the voltage is checked in all point. Ends of circuitry are insulated and laid out into rosette plates. Sockets and breakers are not set up throughout this phase in order to save their surface appearance. The finish puttying of walls is performed all at once. The technically precise control of drying of the layer of the plaster (filling) is carried out by drymeter. It is a special instrument that determines moisture of the material.

The following stage is the procedure of fill. Fill can be made with different products-- from normal masonry cement-sand mix to self-aligning floors. The advantage of the basic mixture is its cheapness, the downside is that such mixture is much more difficult aligned at the level and the last dry time of such fill is 40 days, just then the next phase of the work with floor can be carried out, i.e. the period is too long. Self-leveling self-aligning floors are a lot more costly, but more technological. Aligning takes place almost "immediately" i.e. fluid option of mixture is poured out, then it runs and you receive the horizontal surface area. The last dry time is 15 days i.e. you have significant time economy. The system "warm flooring" is installed into the fill. If the so-called "wet procedures" are inapplicable the technology of the dry lining up (the fill innovation) is used bases for floors with adjustable flooring battens are mounted.

After fill door boxes and door are installed. Setup of doors must take into the account thickness of future flooring covering. After setup the door can be taken off its hinges and removed up until the end of repair work or loaded into polyethylene movie to safeguard from damages. Simultaneously ceiling can be painted and the tile can be laid in that facilities where it was prepared. The tile should be laid on the definitely dry overlay.

Finishing of the floor installing depends upon the prepared covering. In most cases (if finish covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are fixed to the floor by self-tapping screws. One plywood sheet is fixed by 30-50 self-tapping screws to supply the close repairing of plywood and long-lasting service of the floor without squeak and bulging. The plywood provides the additional heat- and acoustic insulation. After mounting of the plywood is ended up, wallpaper for painting can be pasted on walls.

image

In facilities where finish covering of the floor is laminated floor covering or parquet stockpile, the normal wallpapers are pasted (not for painting) in the first location. Then the floor covering is mounted.

If finish covering of the flooring is the block parquet, the parquet is laid in the top place, then it is scraped and covered by one layer of lacquer. After this the normal wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending on the quality of the parquet and lacquer). The mentioned repercussion is linked just with such rushing procedure when the excellent quantity of dust is developed. In spite of the fact that great floor mills are geared up with the vacuum, the adequate quantity of dust is precipitated on surrounding subjects including walls. Dust is very acerbic and is terribly cleaned off. That is why in order not to damage wallpapers, they are pasted after rushing and in order the parquet do not take in the surplus wetness it is covered by the one layer of lacquer before wallpaper pasting.

After this the primary works can be thought about to be finished. It is left just to install the plinths, decorative aspects, breakers and sockets, drape holders, to hang doors, plant-bands and others.

In conclusion it is essential to note that the sequence of works was noted in general and can alter depending upon the certain situation-- the number of spaces in property, your resources, peculiarities of the building of the multilevel facilities. It is based upon sound judgment and every person efficient in analysis can individually create such a series.